Andrews

This was a big project which i was more than happy to take on when i seen the bathroom before we started, a huge bathroom was about to be converted to a large bathroom and en-suite, firstly we stripped out the bathroom and opened up the wall to the bedroom and support the roof, next step we had to support all the beams in the loft area were we had removed the wall below, then joiner then installed the wall to separate the bathroom and en-suite & built the new bedroom wall with door and frame.

Work was then under way on both bathrooms and before we new it the tiler was in and well on his way with both rooms, by the end of the second week the bathroom installers were back and second fixing the bathroom, as you can see the pictures say it all this was a massive transformation and the customer was really happy with the end result, the complete installation of this job was 18 days.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal