Booth

In this project we supplied a kitchen & utility room for our customer in a traditional vanilla classic style door with a wood effect worktops, firstly we showed up at the job and started the striping out of the kitchen and utility,then we called in our gas safe engineer to move the gas supply to the appropriate place, while this is going on our electricians are also in first fixing the new sockets, lighting and oven supplies, after this is complete our plaster was then brought in to skim both rooms.

While this is on going our team of installers are building units ready for the plastering to drying before install starts, by the end of the first week the plastering is starting to dry out and units are beginning to be installed in both rooms worktops are then installed and appliances are cut out for the gas engineer to call back and connect the hob while the plumber connects sink & integrated appliances are installed, the doors where next to be installed along with all accessories, the electrician then came back to second fix down light and socket fronts before the decorators arrived at the end of the week to apply there finishing touches.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal.