In this project we supplied a kitchen for our customer in a traditional vanilla classic style door with a black textured effect worktops, firstly we showed up at the job and started the striping out of the kitchen, while this is going on our electricians are in first fixing the new sockets, lighting and oven supplies, after this is complete our plaster was then brought in to skim the room, while this is on going our team of installers are building units ready for the plastering to drying before install starts.

By the end of the first week the plastering is starting to dry out and units are beginning to be installed in the kitchen, worktops are then installed and appliances are cut out ready for install, next the plumber connects the sink, the doors where next to be installed along with all accessories, the electrician then came back to second fix down light and socket fronts & connect the ceramic hob, final job was to clear everything out so the floor layer could have access to lay the new oak laminate flooring, before the decorators arrived at the end of the week to apply there finishing touches.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal.