IMG_0342

Hawkings

In this project we supplied a kitchen for our customer in a vanilla traditional framed style door with a wood effect worktops, firstly we showed up at the job and started the striping out of the kitchen, this was never going to be a straight forward job due there been two walls to remove and install 3 x RSJ beams so we could open up the overall size of the room,the patio doors were bricked half way for the new window to go in, then we brought in the electrician for the first fix of the consumer unit which had to be upgraded to 17th edition with twin RCD protection, they also installed new double sockets, under cabinet lighting feeds & appliance feeds, then the gas fitter was next to come in and move the gas feed to its appropriate place for the range cooker to be installed.

By the end of the first week the plasters were in and skimming all walls & ceilings, the second week begins with the installers building units and starting to install them along with integrated appliances, worktops start to be installed along with doors, gas fitter and electricians are now back and second fixing, by the end of the second week the job is ready for the tiler to come in before the decorators come to apply there finishing touches.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal.