This project was a tired and dated bathroom which we asked to create a modern wetroom which we stripped out a part tiled bathroom and installed 1st fix plumbing. We made good walls and floor ready for tiling.We installed wetroom tray and waterproofed by taking out wetroom area, then the plaster arrived to skim the ceiling ,the tilers then arrived to start tiling the walls and the floor with travertine stone.

The wetroom area was fitted with travertine stone mosaics. We then installed a modern shower with a fixed head and a 8MM toughened glass screen. A modern basin, pedestal and close coupled toilet were installed along with a 1.8M chrome towel rail. The electrician then fitted 6 spot lights while we fitted glass shelves and customers accessories as required.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal.