20150415_084627

Monkhouse

in this bathroom the customer requested at the point of design that they required a full size bath & a good size shower enclosure, as you can see the finished project was exactly what there were looking for, we started by stripping out the full bathroom so we could re-arrange pipe work for the new design, after removing all the old tiling we had to patch and even dot & dab some of the walls due to existing tiles pulling away a lot of the existing plaster.

We then positioned all new waste pipes for the new enclosure and bath to be installed, once all the pipework was in place we had to cut the opening in the in external wall and support the brickwork with a steel plate ready for the tv installation. we then brought in the tiler who was tiling none stop for 2 days to finish this complete bathroom, the bathroom installers then returned on the Monday of the second week to 2nd fix the bathroom, as you can see the finished project looks outstanding, complete install 8 days.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal