Owens

this project was another fully tiled bathroom/shower room with existing vinyl flooring, which we stripped out and installed first fix plumbing, the ceiling was skimmed and the single light fitting removed, we installed framework to take the inset bath & plaster boarded ready for the tiler, we then installed the shower tray and ply lined the floor, the tiler arrived to fully tile out the bathroom which included two mosaic feature strips one on the inside of the shower enclosure and the other though the centre of the bath area.

We then installed shower enclosure and thermostatic shower, the chrome towel rail was then installed above the bath area at one end. the next step was to install the toilet & free standing vanity unit, once all the bathroom was install the electrician arrived to install the 6 chrome down lights & extractor fan, he finished off by installing a new double switch to the outside of the bathroom to control both lighting and extraction, the job was then finished off with all accessories been installed and the decorating painting the plastered ceiling. complete install was 8 days.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal