Wheeler

In this project we supplied a large kitchen & utility room for our customer in a vanilla ivory grooved style door with a light walnut wood effect worktops, firstly we showed up at the job and started the striping out of the kitchen and utility, while this is going on our electricians are also in first fixing the new oven & microwave supplies & a new consumer unit which had to be upgraded to 17th edition due to no RCD protection on the board, he has also installed a new feed for the induction hob and new sockets, lighting and oven supplies, after this is complete our plaster was then brought in to skim both rooms, while this is on going our team of installers are building units ready for the plastering to drying before install starts.

By the end of the first week the plastering is starting to dry out and units are beginning to be installed in both rooms worktops are then installed and appliances are cut out for the gas engineer to call back and connect the hob while the plumber connects sink & integrated appliances are installed, the doors where next to be installed along with all accessories, the electrician then came back to second fix down light and socket fronts before the decorators arrived at the end of the week to apply there finishing touches.

All tradesmen used on our jobs are qualified & work to a high standard we do not use one man to do all the work this is not possible and most of the time not even legal.